Matters needing attention in field application of small current grounding line selection device

AddTime:2020-09-17 13:36:58   Views:     【 Big Mid Small 】   Print   Close

In order to determine the fault line, the traditional method is to pull the gate one by one, so as to select the fault line and judge the fault location. This method consumes time and reduces the reliability of power supply. Moreover, many times of closing and opening will have impact on the power system and main transformer, and using the switch repeatedly will reduce its service life. In order to solve this problem in time, the small current grounding line selection device is installed.

There are also a lot of matters needing attention in the field installation and use of the small current grounding line selection device. If you do not pay attention to it, it may lead to disaster. As a standardized configuration, the selection of equipment should be determined according to the actual situation on site, and the small current grounding system should be treated strictly.

The characteristics of zero sequence current transformer on the same site are basically the same, so the zero sequence current transformer matching with the company should be selected.

The polarity of all zero sequence current transformers must be strictly consistent, especially the site where zero sequence current transformer and three-phase current transformer are mixed. For systems with more than two busbars, the polarity of current transformers of all incoming devices must be consistent.

The zero sequence current transformer is generally installed under the cable head: the cable sheath grounding wire above the zero sequence transformer must be grounded at the line side after passing through the current transformer; the cable skin grounding under the zero sequence transformer cannot pass through the zero sequence transformer to avoid the formation of short circuit loop.

A large current transformer must be installed as an outgoing lead-in device for the line with double or multi cable power supply.

For all systems with cable outgoing lines, a zero sequence transformer and a secondary line grounding device are installed on each outgoing line. The polarity of current transformer must be consistent.

Under the condition of ensuring the normal operation of the device, the system simulation grounding debugging must be done. In the next article, the small editor will explain the analog grounding debugging method of small current grounding line selection device.


Prev:Preparation before installation of power quality online monitoring device  Next:Application of arc light protection system for switchgear
Back To Top
Copyright ? Bao Ding Shi Simaier Electric Co., Ltd. All Rights Reserved  
    1. 
      

        1. <menu id="hhb45"></menu>
          1. 手机看片AⅤ永久免费,99久色图精品国产,国产精品日韩欧美在线,岛国高清免费不卡顿a,久久久这里只有精品加勒比,久久最新精品视频国产,在线无码免费观看 岛国三级片在线观看 久久免手续费性爱片 高清无码在线观看网址大全 综合亚洲无线码另类mp4 成人无码男男gv在线观看网站 免费毛片在线看片免费 亚洲欧美五码中文字幕